[Q23-Q40] Exam C-P2W43-2023 Realistic Dumps Verified Questions Free [Jun 02, 2026]

Share

Exam C-P2W43-2023 Realistic Dumps Verified Questions Free [Jun 02, 2026]

Valid C-P2W43-2023 Dumps for Helping Passing SAP Exam!

NEW QUESTION # 23
What do you have to consider when setting up phase-based maintenance?

  • A. It comes preconfigured when using the relevant Best Practices scope items.
  • B. It can be used with any existing order type.
  • C. It is mandatory for breakdown and preventive maintenance.
  • D. It is not possible to configure the nine delivered phases.

Answer: A


NEW QUESTION # 24
Which of the below objects can you assign in a notification item? Note: There are 2 correct answers to this question

  • A. Only one cause of damage
  • B. Only one object part
  • C. One or more causes of damage.
  • D. One or more object parts

Answer: C,D


NEW QUESTION # 25
You want to display additional document information within the document flow of a maintenance order.
For which type of document must this be customized?

  • A. Goods movement
  • B. Invoice
  • C. Purchase order
  • D. Service entry sheet

Answer: A


NEW QUESTION # 26
What are characteristics of the Preparation and Scheduling phase within phase-based maintenance? Note: There are 2 correct answers to this question

  • A. If you use the Resource Scheduling apps, you always dispatch orders and operations.
  • B. The configuration of the order type decides whether you use Resource Scheduling or not.
  • C. Maintenance Planning Buckets give you a list of non-approved notifications
  • D. The order moves to the Preparation phase once it is approved and released

Answer: A,D


NEW QUESTION # 27
The planner adds non-stock material in a released maintenance order. What are possible options within the maintenance order? Note: There are 3 correct answers to this question?

  • A. The maintenance order can be set to TECO before the invoice is created
  • B. A purchase requisition can be created automatically as soon as the order is saved.
  • C. A purchase order is created automatically as soon as the order is saved.
  • D. A purchase requisition will ALWAYS be created as soon as the order is saved.
  • E. A goods receipt can be posted after the maintenance order is technically completed.

Answer: A,B,D


NEW QUESTION # 28
What is characteristic for a maintenance order with status REL- if you also consider the capabilities of business functions? Note: There are 3 correct answers to this question.

  • A. The controller can determine actual cost surcharges.
  • B. The assignment of the notification to the maintenance order header cannot be deleted.
  • C. The planner can change planned costs at the operation level
  • D. Goods receipts for external services can be entered.
  • E. The planner can change estimated costs only at the header level

Answer: A,C,D


NEW QUESTION # 29
How is Phase-based Maintenance Processing activated in the SAP system? Note: There are 2 correct answers to this question

  • A. Phase-based maintenance is always active in all S/4HANA 2021 editions and above
  • B. By manually activating the corresponding Business Feature in case Best Practices are not
  • C. Through Best Practices scope items 4HH and 4HI.
  • D. By installing the corresponding enhancement pack and activating the related business function

Answer: A,C


NEW QUESTION # 30
Which of these are necessary steps of the Inspection Checklist process? Note: There are 2 correct answers to this question

  • A. Record the usage decision for an Inspection Lot
  • B. Link PM task list with assigned inspection point type to a maintenance item.
  • C. Generate Inspection Lots assigned to maintenance order headers.
  • D. Generate Inspection Lols within the checklists view.

Answer: A,C


NEW QUESTION # 31
You want to have several plan dates calculated in a maintenance plan.Which scheduling parameter do you use?

  • A. Call horizon
  • B. End Date for Scheduling
  • C. Scheduling period
  • D. Scheduling indicator

Answer: C


NEW QUESTION # 32
Which component is used to display data in the Technical Object Breakdowns and Technical Object Damages app?

  • A. SAP Asset Strategy and Performance Management
  • B. SAP Predictive Analysis
  • C. SAP S/4HANA Core Data Services
  • D. SAP Lumira Designer

Answer: C


NEW QUESTION # 33
Which objects have been enhanced with linear data in maintenance processes? Note: There are 3 correct answers to this question

  • A. Maintenance plan item
  • B. Notification item
  • C. Equipment task list
  • D. Work order confirmation
  • E. Maintenance plan header

Answer: A,B,D


NEW QUESTION # 34
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question?

  • A. Via the SAP Fiori app "Manage Maintenance Order List"
  • B. Via the SAP Fiori app "Maintenance Scheduling Board"
  • C. Via the SAP Fiori epp "Manage Maintenance Planning Buckets"
  • D. Within the SAP Fion-based background job

Answer: A,B


NEW QUESTION # 35
What are the prerequisites for serializing a piece of equipment? Note: There are 3 correct answers to this question

  • A. Maintain a serial number for an existing equipment master.
  • B. Assign a serial number profile to an additional business view for equipment category
  • C. Assign a serial number profile to the equipment category
  • D. Add a serialized material to the equipment serial data view.
  • E. Assign a serial number profile to the related material master.

Answer: C,D,E


NEW QUESTION # 36
Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)? Note: There are 3 correct answers to this question

  • A. Assign a production resource tool (PRT) to the operation
  • B. Plan repair work for the responsible work center
  • C. Find malfunction records already created in a list
  • D. Complete the malfunction report
  • E. Verify planned and actual costs

Answer: B,C,D


NEW QUESTION # 37
How does a performance-based maintenance plan calculate the interval between start date and planned date?

  • A. Cycle length divided by ((scheduling period) x (cycle modification factor))
  • B. Cycle length divided by (monthly performance x 12)
  • C. Cycle length divided by (annual performance/365)
  • D. Cycle length divided by annual performance

Answer: D


NEW QUESTION # 38
You want to assign components to a General Maintenance Task List. What are prerequisites for assigning material components to a task list operation? Note: There are 2 correct answers to this question

  • A. Assign a piece of equipment with allocated material BOM to a task list operation.
  • B. Assign the header material of a material ROM to the assembly field of the task list header
  • C. Assign the header material of a material BOM as assembly to a task list operation.
  • D. Assign the BOM usage for free assignment of material in Customizing

Answer: C,D


NEW QUESTION # 39
In which maintenance object can you use an activity type? Note: There are 2 correct answers to this question.

  • A. Maintenance order header
  • B. Maintenance order operation
  • C. Notification activity
  • D. Work center

Answer: B,D


NEW QUESTION # 40
......

C-P2W43-2023 Exam Dumps For Certification Exam Preparation: https://www.examdiscuss.com/SAP/exam/C-P2W43-2023/

Download Free SAP C-P2W43-2023 Exam Questions & Answer : https://drive.google.com/open?id=17uzFRJGO4ZADvgrf6bCMH3OPEF5uFhIm

0
0
0
10