Exam C-IBP-2502 Topic 8 Question 8 Discussion

Actual exam question for SAP's C-IBP-2502 exam
Question #: 8
Topic #: 8
You need to use your resource cost-effectively with a certain minimum use, even if it means producing more than demand. Which solutions would apply to this scenario? Note: There are 2 correct answers to this question.

Suggested Answer: A,C Vote an answer

This scenario involves optimizing resource use with a minimum threshold, potentially overproducing, in SAP IBP's supply planning, per its documentation.
* Option A: Excess stock can be generated and will need to be staged in an overflow warehouseThis is correct. Overproduction to meet minimum use generates excess stock, requiring storage (e.g., overflow warehouse), a practical outcome, per SAP IBP's planning behavior.
* Option B: Capacity leveling will be possible for production and storage resourcesThis is incorrect.
Capacity leveling (smoothing production) is a PP/DS feature, not standard in IBP's time-series planning.
* Option C: Balance can be achieved between excessive prebuild and minimum use by incorporating violation costsThis is correct. The Supply Optimizer can balance minimum utilization (via costs) and excess production (via inventory costs), a supported solution, per SAP IBP's optimization features.
* Option D: Minimum capacity utilization will result in pull productionThis is incorrect. Pull production (demand-driven) contradicts producing beyond demand; this scenario aligns with push logic.
Thus, A and C apply, per SAP IBP's official supply planning capabilities.

by Jay at Dec 18, 2025, 06:08 PM

Comments

Chosen Answer:
This is a voting comment (?) , you can switch to a simple comment.
Switch to a voting comment New
Nick name: Submit Cancel
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

0
0
0
10