Nortel 920-195 Exam Information and Actual Questions

  • Exam Code/Number: 920-195
  • Exam Name/Title: BCM50 Ris. 2.0 Installation and Initial Configuration
  • Certification Provider: Nortel
  • Corresponding Certification: Nortel Other Certification
  • Exam Questions: 45
  • Updated On: Oct 05, 2026

920-195
FREE EXAM DUMPS QUESTIONS & ANSWERS

Nortel
920-195 Exam
BCM50 Ris. 2.0 Installation and Initial Configuration

Get 920-195 Premium File

This exam has been stopped to register, new exam code replace: 920-335

Nortel 920-195 Exam Overview:

Certification Vendor:Nortel
Exam Name:BCM50 Rls. 2.0 Installation and Initial Configuration
Exam Number:920-195
Exam Format:Scenario-Based, Multiple Choice
Passing Score:70%
Exam Duration:90–120
Real Exam Qty:45–60
Available Languages:English
Related Certifications:920-197 BCM50 & BCM200/400 Configuration and Maintenance
Exam Price:$150–$200 USD
Certificate Validity Period:No longer valid (Nortel retired)
Recommended Training:Nortel Official BCM50 Installation Guides
Exam Registration:Prometric (legacy)
Sample Questions:Nortel 920-195 Sample Questions
Exam Way:Previously offered via Prometric test centers; no longer available
Pre Condition:Recommended: Basic telephony/IP networking knowledge; no mandatory prerequisites
Official Syllabus URL:https://www.nortel.com/ (discontinued)

Nortel 920-195 Exam Syllabus Topics:

SectionWeightObjectives
BCM50 System Overview20%- System capacity and supported configurations
- Hardware components and specifications
- Software Release 2.0 features and architecture
Feature Configuration and Verification15%- Digital and IP telephone setup
- Basic dial plan and call routing
- System backup and restore procedures
System Initial Configuration30%- Basic telephony and IP trunk configuration
- System time, region, and licensing
- IP addressing and network setup
- Accessing Element Manager and CLI
Troubleshooting and Basic Maintenance10%- Startup and connectivity issues
- Log analysis and error identification
- Firmware and software update basics
Installation and Site Preparation25%- Physical installation and cabling
- Power and grounding procedures
- Site requirements and environmental considerations
- Initial power-up and verification


0
0
0
10