Exam HPE6-A85 Topic 1 Question 87 Discussion
Actual exam question for HP's HPE6-A85 exam
Question #: 87
Topic #: 1
Question #: 87
Topic #: 1
After having configured the edge switch uplink as requested your colleague says that they have failed to ping the core You ask your colleague to verify the connection is plugged in and the switch is powered on They confirm that both are correct You attempt to ping the core switch and confirm that the ping is failing.
Knowing the nature of this deployment, what commands might you use to troubleshoot this issued
Knowing the nature of this deployment, what commands might you use to troubleshoot this issued
Suggested Answer: C Vote an answer
These commands might help troubleshoot this issue as they check various aspects of the connectivity between the edge switch and the core switch, such as Layer 3 reachability, Layer 2 adjacency, LACP configuration and status, VLAN trunking configuration, and interface status. Reference: https://www.arubanetworks.com/techdocs/AOS-CX_10_04/CLI/GUID-8F0E7E8B-0F4B-4A3C-AE7F-0F1B5A7F9C5D.html
by Dora at Aug 04, 2026, 12:38 PM
0
0
0
10
Comments
Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.
Report Comment
Commenting
You can sign-up / login (it's free).