Free D-PM-IN-23 Questions for EMC Dell PowerMax Install 2023 D-PM-IN-23 Exam as PDF & Practice Test Engine
Which software tools are essential for upgrading a PowerMax 2000 and 8000 array? (Choose two)
Correct Answer: B,D
Vote an answer
A PowerMax 8000 four-brick system with 1 TB cache-per-brick is being upgraded with a new brick.
What are the supported cache-per-brick options for the new brick?
What are the supported cache-per-brick options for the new brick?
Correct Answer: A
Vote an answer
In a PowerMax 2500 model, the node pair consists of which components?
Correct Answer: D
Vote an answer
What is a unique feature of PowerMax 8500 compared to PowerMax 2500?
Correct Answer: C
Vote an answer
In a PowerMax 8000 upgrade, what is the role of the Install Script?
Correct Answer: D
Vote an answer
Which of the following are correct about the bay configurations in PowerMax 2500 and 8500?
Correct Answer: A,C
Vote an answer
In a PowerMax 8500, there is a Data Reduction Offload Module that must be replaced.
What color indicates the areas to grasp the module for removal?
What color indicates the areas to grasp the module for removal?
Correct Answer: B
Vote an answer
PowerMax Inline Compression operates at which granularity level?
Correct Answer: B
Vote an answer
0
0
0
10
